DSC00481It’s been a few days since I posted a video, so I thought I’d better do a walkthrough, and snap some pictures along the way.  They have pretty much buttoned up the entire house now, with the exception of the garage door and the windows across the back of the basement.  It feels much more secure and much more weather resistant.

We’ve had a finished roof for 6 days now, so the crew went to work wrapping the house, then getting the windows and doors in.  We also had a shower and tub delivery, which forced us to make a decision on some Master Bath items like the shower and tub.  I’ll do a follow up post on those, be we had great success through a single website.

Here’s A Video Of The Progress

Here’re Some Photos of the Progress

DSC00449 DSC00450 DSC00451 DSC00452
Kids Bathtub – Lasco Super Core 2603 sg scrbi

DSC00453 DSC00454 DSC00455 DSC00456 DSC00457
DSC00458
Kids’ Play Room

DSC00460
Master Bedroom Tray Ceiling

DSC00459
Master Closet on the Left, Master Bath on the Right


DSC00461 DSC00462

DSC00463
1st Floor Shower – Lasco Super Core 1483-ossclbi

DSC00464 DSC00465 DSC00466 DSC00467 DSC00468 DSC00469 DSC00470 DSC00471 DSC00472 DSC00473 DSC00474 DSC00475 DSC00476 DSC00477 DSC00478 DSC00479 DSC00480 DSC00481 DSC00482 DSC00483 DSC00484 DSC00485 DSC00486 DSC00487 DSC00488 DSC00489 DSC00490 DSC00491 DSC00492 DSC00493 DSC00494 DSC00495